25 November 2010

Framing Complete

Pappy, Skip, and James finished up this week.  They'll be back for a few small details later, but the bulk of the work is done.  Here's Pappy with the columns:


And Skip with the monster saw used for the columns:
Skip and James have lunch out front because Charlie is jackhammering the living room floor to add in electrical outlets.


Charlie finishing up the electrical wiring:


And here is one of the floor outlets:




We are now ready for inspection, the plumbing valves are in and the propane lines have been run and pressure tested.  We ran a line into the utility room even though we will be using an electric dryer.


And we've also wired the the house with CAT6 cable, TV/phone lines, and ceiling speakers.  Here's the main media lines which will go into a rack mount system in the built in media cabinet/shelves.